Equipment Operation Issues
Main Tendon Positioning Deviation
Phenomenon: Uneven spacing of the main bars, exceeding the allowable tolerance (>±3 mm)
Resolution:
- Check the calibration status of the laser positioning system and recalibrate the reference point
- Clear welding slag and debris from the track to ensure smooth movement of the sliding table
- Verify the feedback value of the servo motor encoder; replace the damaged coupling if necessary
- Adjust the hydraulic clamping device pressure to the standard range (0.6–0.8 MPa)
Unstable Welding Quality
Typical Defects: Porosity, undercut, incomplete penetration
Resolution:
• Check the purity of the shielding gas (CO₂ ≥ 99.8%)
• Clean the welding torch's contact tip and replace worn wire feeding hoses
• Recalibrate the stick-out length of the welding wire (recommended: 12–15 mm)
• Conduct process verification tests on welding parameters
(e.g., for 28 mm steel bars: current 280–320 A, voltage 28–32 V)
Electrical System Failures
Servo Driver Alarm
Common Alarm Codes:
E-05 (Overload): Check for mechanical transmission resistance and measure motor winding insulation
E-11 (Encoder Error): Inspect encoder connections and replace damaged cables
Emergency Handling: After powering off and resetting, perform a low-speed trial run (30% of rated speed)
PLC Communication Interruption
Troubleshooting Steps:
- Check for oxidation on the Profinet connector
- Measure network terminal resistance (should be 110 Ω)
- Restart the switch and update firmware
- Check for IP address conflicts among all nodes
Mechanical Component Maintenance
Abnormal Noise from Rotating Disc
Solution:
√ Replenish grease (use EP2-grade lithium-based grease monthly)
√ Check slewing bearing clearance (axial clearance ≤ 0.15 mm)
√ Adjust reducer gear backlash (side clearance: 0.10–0.15 mm)
Hydraulic System Leakage
Key Inspection Areas:
- Cylinder sealing rings (replacement cycle: every 2,000 hours)
- High-pressure hose fittings (tightening torque: 120 N·m)
- Valve block mounting surfaces (flatness tolerance: ≤ 0.02 mm)
Key Process Control Points
Winter Construction Precautions
When ambient temperature is below 5 °C:
★ Preheat materials to 80–120 °C (measured with an infrared thermometer gun)
★ Extend interlayer cooling time by 30% compared to room temperature
★ Use low-temperature welding wires (e.g., JM-58)
Special Material Processing
For High-Strength Steel Bars (HRB600):
◇ Reduce welding speed by 20%
◇ Use argon-rich shielding gas (80% Ar + 20% CO₂)
◇ Apply post-weld slow cooling (cover with asbestos felt)
Maintenance of Intelligent Systems
Visual System Calibration
- Calibrate the chessboard pattern monthly
- Maintain lighting intensity between 500–800 lux
- Keep calibration error within ±0.1 pixel
- Update the camera's internal parameter matrix
Database Management
Regular Tasks:
♦ Back up process parameters (incremental backup recommended weekly)
♦ Clear log files (retain logs from the last 30 days)
♦ Optimize SQL query indexes
Safety Precautions
Emergency Handling
In the event of a sudden power outage:
✓ Activate the emergency power supply immediately (ensure safe shutdown for at least 15 minutes)
✓ Manually release pressure from the hydraulic accumulator
✓ Record the current coordinate positions of all axes
Daily Safety Inspection
Must confirm:
Grating protection device response time is ≤ 50 ms
Emergency stop circuit impedance is < 1 Ω
Grounding resistance is < 4 Ω